Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Hitching Mobile Plant To Vehicle Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to Hitch a Mobile Plant To Vehicle Safely.

Hitching Mobile Plant's To Vehicles needs to be used with caution and appropiate safety procedures. The Hitching Mobile Plant To Vehicle procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Connecting Preparation
  • Connecting Vehicle To Mobile Plant
  • Preparing To Leave With Trailer Attached
  • Emergencies

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Hitching Mobile Plant To Vehicle Safety Notes

When Hitching A Mobile Plant:

  • Check tyre, jockey and brake line for any damage.
  • Line up vehicle to mobile plant.
  • Check pin open, hoses and electrical plug.
  • Release tyre brake and or wheel chock.
  • If conditions are unsure, evacuate to atleast 50 metres.
Back  Buy Now $79.95 plus GST