Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Jigsaw Safe Work Procedure or Work Method Statement

The six page Safe Work Method Statement outlines the Safety Steps required to operate a Jigsaw Safely.

Jigsaw's need to be used with caution and appropiate safety procedures. The Jigsaw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Personal Qualifications and Experience
  • Preparation
  • Pre-Start Checks
  • Blade Replacement
  • Operation
  • On Completion
  • General Maintenance

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Jigsaw Safety Notes

Before Operating A Jigsaw:

  • Jig saws should always be used with a safety switch.
  • Ensure the work area is clear of debris. Example – Previous off cuts have been moved to a safe position.
  • Check the trigger switch and Lock-On button operates correctly and does not stick.
  • Check the blade roller guide is adjusted so that it is in slight contact with the rear of the blade.
Back  Buy Now $79.95 plus GST