Work Method Statements
Linisher – Belt and Disc Sander Safe Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Linisher – Belt and Disc Sander Safely.
Linisher's need to be used with caution and appropiate Safe Work Method Statements. The Linisher – Belt and Disc Sander Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Personal Qualifications and Experience
- Site Awareness
- Pre-Start Checks
- Operation
- On Completion
- General Maintenance

Linisher Safety Notes
Before Operating A Linisher:
- Ensure the area around linisher is clear of obstructions and the floor is free from dust.
- All guards must be in-place. Linisher face guards must be clean and in place.
- The Linisher should be firmly bolted to the ground. (This ensures that the linisher will not topple over and should reduce the noise level.)
- Locate and ensure you are familiar with the operation of the ON/OFF starter and the E-Stop.
References: |
|
|
State - Occupational Health and Safety Act. National Training Information Service - NTIS – LMFFM1002A: Operate basic woodworking machines. Western Australia - Department of Employment and Consumer Protection - Noise management data sheets: sander/linisher. |