Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Metal Turning Lathe Safe Work Procedure or Work Method Statement

The five page Safe Work Method Statement outlines the Safety Steps required to operate a Metal Turning Lathe Safely.

Metal Turning Lathes need to be used with caution and appropiate safety procedures. The Metal Turning Lathe procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Preperation
  • Pre-start Checks
  • Set-Up Machine
  • Commence Operation
  • Close Down Machine
  • Clean Up

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Metal Turning Lathe Safety Notes

Before Operating A Metal Turning Lathe:

  • Always keep work area clear of any obstacles on the floor.
  • Set the tool bar assembly to the correct height.
  • Switch on the machine.
  • Position the coolant nozzle over the work.
  • Ensure tool bar has sufficient clearance away from the spinning chuck.
Back  Buy Now $79.95 plus GST