Nail Gun - Pneumatic Safe Work Method Statement

SWP_Sample

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Nail Gun - Pneumatic Safely.

Nail Gun's need to be used with caution and appropiate Safe Work Method Statements. The Nail Gun - Pneumatic Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Pre-Start Checks
  • Loading The Nail Gun - Clearing A Jam
  • Operation
  • On Completion
  • Close Down

 

Buy Now $79.95 plus GST

Nail Gun - Pneumatic Safety Notes

Before Operating A Nail Gun:

  • Clearly display one or more warning signs that nail guns are in use.
  • Ensure all air hoses are located where they will not be damaged. Example: - not across walkways.
  • Employers/foremen/principal contractors monitor the use of the nail guns to ensure that the safe systems of work are being maintained by the operators.
  • The Nail Gun must be inspected before being connected to the air supply hose.