Work Method Statements
Painting (General Requirements) Safe Work Method Statement

The five page Safe Work Method Statement outlines the Safety Steps required to Paint Safely.
Painting needs to be used with caution and appropiate Safe Work Method Statements. The Painting Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Material Safety Data Sheet (MSDS)
- Risk Assessment
- Preparation
- Painting Tins
- Brushes
- Disposal
- Storage

Painting (General Requirements) Safety Notes
Before Painting:
- Check that there is adequate ventilation when indoors.
- Mask switches and other items.
- Preferrably have power isolated where possible.
- Removed door handles and locks where possible, otherwise mask them.
- Use a paint shaker if available.
- Dry tins can be disposed of as solid waste.