[ Panel Saw Work Method Statement
Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Panel Saw Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Panel Saw Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the steps for the safe Operation of a Panel Saw.

The Panel Saw procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Panel Saw Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre-operation Inspection
  • Operation
  • Completion
  • Maintenance
  • Emergency Procedures & First Aid

Product Details:

  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Operation:

Adjust hood guard so that it is as close to timber as possible. Keep saw blade lowered as far as possible (to suit work piece) Do not stand in line with timber (Stand to one side to avoid injury due to kickback). Ensure materials correct for job.

Example: Plywood, MDF, natural timber approx 30mm thick. (For thinner work pieces – use jigsaw). Nails/screws are removed. Where possible, knots are removed.

Follow manufacturers’ instructions for use. Start saw – ensure it does not touch material before it is at full RPM (remove timber from blade if re-starting). Guide gently and steadily, keeping hands clear of blade. Do not force movement or over-reach.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.