Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Plasma Cutter Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Plasma Cutter Safely.

Plasma Cutters need to be used with caution and appropiate safety procedures. The Plasma Cutter procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Preparation
  • Operation
  • Completion
  • Emergency Procedures

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Plasma Cutter Safety Notes

Before Operating A Plasma Cutter:

  • Keep a fire extinguisher nearby and have a watch person ready to use it.
  • Use ventilation fans to remove the fumes.
  • Do not hold the material near the cutting path.
  • Remove grease and all surface coatings first, unless they are ment to be welded or cut through.
  • Check for gas leaks.
  • Turn off power before dissassembling torch.
Back  Buy Now $79.95 plus GST