Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Post Driver

SWP_Sample

Product Details:

  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

Post Driver Information:

The Post Driver Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the steps for safe operation of a Post Driver.

This SWMS covers the use of pneumatic and manually-operated post drivers (star-picket drivers). This does not include tractor-mounted drivers.

The Post Driver procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Post Driver (pneumatic and hand held) procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-inspection
  • Operation
  • Emergency Procedures
  • Employee sign off
Planning
Inspect intended work area. Check:
  • Underground services/utilities (Dial before you dig)
    Type of soil (wet, dry, compact etc)
  • Suitable driver capacity (light, heavy duty etc)
  • Suitable for number of poles required (for large jobs – use pneumatic.)
  • Posts are suitable for type of driver.
  • Rocks, tree roots etc.
  • Weather conditions
  • Lighting
  • Cliffs, pits, drop-offs etc.
References:
  • OHS Legislation in all States
  • Safe Work WA (2009). Post Drivers – Industry Safety Standard
  • Safe Work Australia – National Code of Practice for the Prevention of Musculoskeletal Disorders Caused From Performing Manual Tasks.
  • WorkSafe Victoria (2008) First Aid in the workplace - Compliance Code.

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST