Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Powder Coating Work Method Statement

The six page Work Method Statement outlines the Safety Steps required to Safely Powder Coat.

Powder Coating needs to be used with caution and appropiate safety procedures. The Powder Coating procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.



The Work Method Statement includes:

  • Specific Risks
  • Operators Requirements
  • Respirators
  • Daily Maintenance
  • Pre-Start Daily Checks
  • Doing
  • Finishing Spraying
  • Personal Hygiene
  • Spray Booth Inspectors

Powder Coating Work Method Statement

Back Buy Now $79.95 plus GST

Powder Coating Work Method Statement

Powder Coating Safety Notes

When Powder Coating:

  • Smoking is strictly prohibited and all sources of ignition, such as matches and lighters, must be excluded.
  • Check the tightness of all connections and the condition of the face piece, headbands and valves before each use.
  • Clean regularly and store in a dust-free area.
  • Replace Air Filters. Varies upon usage.