Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Remote Area 4 Wheel Driving Safe Work Method Statement

SWP_Sample

The eight page Safe Work Method Statement outlines the Safety Steps required to operate a 4 Wheel Drive in Remote Area's Safely.

Four Wheel Driving needs to be approached with caution and appropiate Safe Work Method Statements. The Remote Area 4 Wheel Driving Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Operators Requirements
  • Vehicle Maintenance
  • Pre-Start Daily Checks
  • Vehicle Operation
  • Crossing Rivers and Creeks
  • Wheel Removal and Replacement
  • Getting Out Of A Bog
  • Emergency Procedures

 

Buy Now $79.95 plus GST

Remote Area 4 Wheel Driving Safety Notes

Before Operating A Four Wheeler In Remote Areas:

  • If Vehicle is over 8 tonnes GVM with 2 axles then a Medium Rigid Licence is required.
  • Check the vehicle is regularly maintained and serviced in accordance with the manufacturer’s recommendations
  • Tyre pressure should be checked when tyres are cold, before vehicle is operated.
  • Before starting motor, ensure transmission is in neutral and check throttle and brakes for proper operation.
Buy Now $79.95 plus GST