Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Replacing Tyres And Rims Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to Replace Tyres And Rims Safely.

Replacing Tyres and Rims need to be approached with caution and appropiate safety procedures. The Replacing Tyres and Rims procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Position Vehicle
  • Locate Equipment
  • Preparation For Wheel Removal
  • Wheel Removal And Replacement
  • Pack Up Site

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Replacing Tyres and Rims Safety Notes

Before Replacing Tyres and Rims:

  • Park the vehicle in a safe location - away from traffic.
  • Refer to the vehicle handbook for location of jacking points and operation of the jack.
  • Ensure there is a firm base on which to place the jack.
  • Ensure all wheel nuts are securely fastened and replace the hubcaps.
  • Secure the unserviceable tyre in an appropriate place.
Back  Buy Now $79.95 plus GST