Work Method Statements
Rip Saw Safe Work Procedure or Work Method Statement
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Rip Saw Safely.
Rip Saw's need to be used with caution and appropiate safety procedures. The Rip Saw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Operators Requirements
- Site-Awareness
- Preparation
- Fitting New Blades
- Operation
- On Completion
- General Maintenance


Rip Saw Safety Notes
When Operating A Rip Saw:
- No person is to use the Rip Saw unless they are trained bya relevant person.
- Use ear muffs and goggles at all times.
- Do not wear loose clothing or jewellery.
- Check and adjust all safety devices.
- Tighten the nut with an even pressure.