Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Scraper Operation Safe Work Method Statement

SWP_Sample

The nine page Safe Work Method Statement outlines the Safety Steps required to operate a Scraper Safely.

Scraper's need to be used with caution and appropiate Safe Work Method Statements. The Scraper Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Operators Requirements
  • Significant Risks
  • Site Awareness
  • Transporting
  • Conduct Routine Checks
  • Access
  • Seat Adjustment
  • Starting
  • Operating
  • Site Safety
  • On Completion
  • Refuelling
  • General Maintenance

 

Buy Now $79.95 plus GST

Scraper Operation Safety Notes

Before Operating A Motor Grader:

  • There is restricted visibility to the rear of the scraper cab due to length of the bowl and associated equipment.
  • When entering, always use the hand rails and steps provided and face the cabbin at all times.
  • Never attempt to start or operate the scraper except from the operator’s seat. Example – by not leaning into the cabin.
  • Ensure the seat is locked in position and cannot rotate unless released by the operator.
Buy Now $79.95 plus GST