Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Installation of Screen Doors and Windows

SWP_Sample

Product Details:

  • 8 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

The Installation of Screen Windows and Doors Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the steps for safely installing screen windows and doors.

This SWMS covers the installation of screen doors and windows at premises. This does not include regular work at heights (above 2m). Electrical power tools are not used for this task The Installation of Screen Windows and Doors procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Installation of Screen Windows and Doors Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre- operational inspection
  • Operation
  • Emergency Procedures
  • Employee sign off
General Safety Notes
Ensure workers have access to:
  • First aid kit/supplies
  • Communication devices (check mobile phones will have service in area)
  • Drinking water, clean-up and toilet facilities
  • PPE required
References:
  • OHS Legislation in all States
  • WorkSafe Victoria Code of Practice for Manual Handling
  • WorkSafe Victoria 2005 - Basic Steps to Preventing Falls from Heights

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST