Security Patrol and Lock Up Safe Work Procedure or Work Method Statement
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Refuelling
- References
- References
- 6 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant e-mail delivery
|
Security Patrol and Lock Up Information:
The Security Patrol and Lock Up Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for conducting security patrols in designated premises. The Security Patrol and Lock Up Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Security Patrol and Lock Up procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
|
Planning
Develop and implement communication protocol:
- Mobile phones/radios to be kept on employee at all times
- Mobile phones/radios to be kept switched on
- Employees call supervisor upon arrival and departure and regular call-ins over patrol shift (at least 1 per hour)
- Supervisor must have address details, expected arrival/departure and visit duration times.
- Supervisors have details of employee’s vehicle (registration, colour, make, model).
- Employees to attend only the site directed by Supervisor.
- Code words should be established to indicate employee is in threatening situation.
- Emergency procedures in place if call-ins not followed, or communication lost with employee
|
|
|
|
|