Work Method Statements
Spindle Moulder Safe Work Procedure or Work Method Statement
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Spindle Moulder Safely.
Spindle Moulders need to be used with caution and appropiate safety procedures. The Spindle Moulder procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Operators Requirements
- Site Awareness
- Preparation
- Pre-Start Daily Checks
- Operation
- On Completion
- General Maintenance


Spindle Moulder Safety Notes
Before Operating A Spindle Moulder:
- Ensure the dust extractor is operating before using machine.
- Do not wear loose clothing or jewellery.
- Do not distract or startle operator while he or she is using equipment.
- Balance cutters to prevent vibration.
- Keep the machine and the floor of the workplace clean and clear of chips, dust and workpieces.
- Keep hands out of the line of cutter.