Work Method Statements
Thicknesser Safe Work Procedure or Work Method Statement
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Thicknesser Safely.
Thicknessers need to be used with caution and appropiate safety procedures. The Thicknesser procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Operators Requirements
- Saftey Awareness
- Replacing Cutting Blades
- Operation
- On Completion
- Emergency Procedures


Thicknesser Safety Notes
Before Operating A Thicknesser:
- Do not wear loose clothing or jewellery.
- Clean out all chips, dust, pitch or foreign matter adhering to the drum or blades before installing the blades.
- Ensure the dust extractor heads are firmly connected to the thicknesser to avoid rattles.
- In an emergency quickly make the immediate work area safe by turning off any running plant and equipment, if safe to do so.