Work Method Statements
Timber Framework Work Method Statement
The Timber Framework Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for erecting timber framework.
The Timber Framework procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Timber Framework Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Emergency Procedures
Product Details:
- 10 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Preparation
Ensure site suitable:
- Soil testing/classification complete and suitable for bearing capacity
- Cleared (logs, trees, roots, stumps, debris and other termite risks)
- Drainage in place (divert surface/sub-surface water. Prevent ponding by filling, grading, or drainage channels
Assess site for safe access of equipment and materials delivery. Ensure:
- Ground is firm, stable and within acceptable gradient for equipment
- No overhead powerlines
- Not parked between work and vehicle pathways (provide suitable traffic management as required)
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.