Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Asbestos Removal (Friable) Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Friable Asbestos Removal Safe Work Method Statement

The Friable Asbestos Removal Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure outlining the safety steps for the Removal of Friable Asbestos.

The Friable Asbestos Removal Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

Friable Asbestos means asbestos-containing material which, when dry, is or may become crumbled, pulverised or reduced to powder by hand pressure. Common examples: sprayed pipe lagging, gasket covers, and insulation.

The Safety Procedure includes:

  • Planning
  • Personnel
  • PPE
  • Tools and Equipment
  • Set Up
  • Operation
  • Clean Up
  • References
  • Risk Ratings

Product Details:

  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Additional Safety Notes

Respiratory Protection-ensure:

  • Persons are deemed medically fit to wear
  • Issued to individuals
  • Fit testing is conducted by competent person
  • Complete facial seal (no facial hair)

Note: Continuous flow positive pressure respirators should be provided for persons with beards/stubble. Use correctly- fitting air-supply hoods for persons who need prescriptions glasses.

Do not leave respirators in asbestos contaminated area when not in use. Do not leave hanging around neck.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.