Work Method Statements
Asbestos Removal (Non-Friable) Safe Work Method Statement

This 11 page Safe Work Method Statement outlines the Safety Steps required to operate Air Compressor's Safely.
Non-Friable Asbestos means asbestos-containing material which, when dry, does not become crumbled, pulverised or reduced to powder by hand pressure. Common examples: cement sheeting, ceiling tiles, vinyl tiles
This Safe Work Method Statement has been developed for employers to be able to give direct instructions on how to operate an TITLE safely. The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.
The Safe Work Method Statement includes:
- Planning
- Personnel
- PPE
- Tools and Equipment
- Set Up
- Operation
- Clean Up
- References
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.
Asbestos Removal Additional Safety Information
Prior to Commencing Asbestos Removal:
Barricade area to prevent persons entering site.. This should remain until clearance certificate has been issued.
Place caution signs in prominent locations (eg: entry to site, entry/exit to removal area). Signs should state Do not enter Asbestos or similar.