Work Method Statements
Concrete Formwork Safe Work Method Statement

The 16 page Safe Work Method Statement covers the risks associated with Concrete Formwork and the best methods to counter these risks.
This Safe Work Method Statement has been developed for employers to be able to give direct instructions on how to safely construct Concrete Formwork. The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.
The Safe Work Method Statement includes:
- PPE
- Safety Notes
- Design Specifications
- Preparation
- Personnel Requirements
- Risk assessment
- Risk Control
- Framework Erection- Traditional & False deck
- Loading Materials
- Prepour Inspection
- During concrete pour
- Dismantling formwork (stripping)
- Emergency Plan
- References
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.
Concrete Formwork Additional Safety Information
- Certification of design must be provided by a suitably qualified person.
- All framing must be completed so it complies with on site design documentation and manufacturers requirements.
- Concrete should be inspected before dismantle.