Concrete Helicopter Safe Work Method Statement

The Concrete Helicopter Safe Work Method Statement is a 7 page procedure outlining the steps for using a Concrete Helicopter, the risks or hazards of each step and control measures.
Concrete Helicopters (Also referred to as Power Trowels, Cement Trowels, Helicopters / Choppers or Cement Floats) can be either petrol or electrically powered.
The Safe Work Method Statement includes:
- PPE
- Operators requirements
- Transportation
- Planning
- Preparation and Site Awareness
- Pre commencement checks
- Operation
- On completion
- References
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.
Concrete Helicopter Additional Safety Information
Concrete Helicopter Pre Commencement Checks
- Place the Power Trowel within close proximity to the work area.
Undertake a final check of:
- All relevant PPE;
- The Power Trowel ( check the condition of the blades & ensure guard is fitted)
- Work area.
On completion of trowelling activities ensure:
- Unit / Power is turned off and disconnected;
- Allow Trowel sufficient time to cool down prior to handling;
- Thoroughly wash all concrete product off unit and blades;
- Remove any waste created during activity