Work Method Statements
Dozer Operations Safe Work Method Statement

The Dozer Operations Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the safety steps for operating a Bulldozer for general earthworks.
The dozer procedure is ready to use and is not a blank template. Simply add your company details and add any site specific details or risks.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Dozer procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safe Work Method Statement includes:
- PPE
- Safety Notes
- Operators Requirements
- Transportation
- Job Preparation
- Site Preparation
- Pre Operational Checks
- Operation
- On Completion
- References
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.
Dozer Operation Additional Safety Information
When Operating A Dozer:
- Ensure the immediate area is kept clean of all non-essential personnel
- Always wear a seat belt
- Always travel up and down slopes at slow speeds
- Ensure the key is removed when left unattended
- When finished, inspect the work area and ensure all wastes and materials have been removed.